The cost Report provides all the background information to verify the vehicle’s actual cost and also allows the team to present any design features or fabrication processes that are innovative or are expected to result in significant cost savings. I have worked in the cost estimation team and designed the ATV Under budget. During the journey, we explored various real time engineering problems which challenged our effective cost strategy. The overall cost was reduced by 20% compared to the previous year.